1, Power cord connection
L1, L2, and L3 are 3 Live Wires as per fig.4, PE wire is Each Wire, N is Naught Wire(Announcements: Five wires must be connected completely, preventing phase default. If the connection is not complete, the consequences have nothing to do with our company, resulting in damage to the circuit motor. The cost of replacement parts shall be borne by the buyer)
2, Pay attention to the positive and negative rotation of the motor during connection
Then, start the machine and close it at once, Observe the MARK(Fig.5) at the top of the pump, Checking whether the pump vane rotates according to the direction shown on the MARK(Fig.5), If its rotating direction is the same as the MARK, indicating a successful connection.(It can be turned manually before starting the machine)
Otherwise, Exchange the position among any two of the three live wires(L 1, L 2, L 3), Check whether the vane rotation direction is right or not again Until the correct motor rotating direction is attempted(Do not reverse, idle, or start without water)